The T7 corded miner cap lamp features 1 main 3W LED light and 2 auxiliary LEDs, powered by a high-capacity 6.6Ah rechargeable Li-ion battery. Available with blue or yellow bezel ring options and equipped with a press-type switch, this lamp connects to the battery case via a 1.65m mining cable.
| Model No. | GLT-7C |
|---|---|
| Light source | One main light, two auxiliary lights |
| Battery Capacity | 7.8 Ah rechargeable li-ion battery |
| Rated Voltage | 3.7v |
| Main light current | 450mA |
| Power of main light | 1.67W |
| Illuminous | 216lum |
| Brightness | 15000lux |
| Life span of main light | 100000hrs |
| Battery cycles | 1000 cycles |
| Working time | 17hrs |
| Weight | 420g |
| Water-proof grade | IP67 |
GREEN LIGHTING ELECTRONICS CO., LTD is a specialized LED miner's lamp manufacturer with dedicated research and development capabilities. We focus on quality and innovation to meet our customers' requirements.